• Aug 10, 2026 News!Vol.18, No. 3 has been published with online version.   [Click]
  • Jun 29, 2026 News!Vol.18, No. 2 has been published with online version.   [Click]
  • Mar 30, 2026 News!Vol.18, No. 1 has been published with online version.   [Click]
General Information
    • ISSN: 1793-8236 (Online)
    • Abbreviated Title Int. J. Eng. Technol.
    • Frequency:  Quarterly 
    • DOI: 10.7763/IJET
    • APC: 500 USD
    • Managing Editor: Ms. Isa Yuan 
    • Abstracting/ Indexing:  CNKI,  Google Scholar, Crossref, EBSCO  etc.
    • E-mail: ijet_Editor@126.com
IJET 2011 Vol.3(4): 435-439
doi: 10.7763/IJET.2011.V3.266

Design & Analysis of an Optimized Grid-tied PV System: Perspective Bangladesh

Md. Rejwanur Rashid Mojumdar 1,2 , Arif Md. Waliullah Bhuiyan 3 , Hamza Kadir 1,4 , Md. Nizamul Haque Shakil 5 , Ahmed-Ur-Rahman 6

  • 1 AREVA T&D Bangladesh, Bangladesh
  • 2 HM Enviro Care, Dhaka, Bangladesh
  • 3 BRAC, Mohakhali, Dhaka, Bangladesh
  • 4 Grameenphone Ltd., GP House, Dhaka, Bangladesh
  • 5 Rahimafrooz Accumulators Ltd., Gazipur, Bangladesh
  • 6 Novo Tel Limited, Gulshan, Dhaka, Bangladesh

Abstract

In Bangladesh, the role of Distributed Generation (DG) is increasingly being recognized as a supplement and an alternative to large conventional central power supply. The government and many non-governmental organizations have tried to comprehend and strived to address the problem of energy through promoting Solar Home Systems (SHSs) in off-grid areas. Though centralized economic system that solely depends on cities is hampered due to energy deficiency, the use of solar energy in cities is never been tried widely due to technical inconvenience and high installment cost. To mitigate these problems, this paper proposes an optimized design of grid-tied PV system without storage which is suitable for Bangladesh as it requires less installment cost and supplies residential loads when the grid power is unavailable. This paper also analyzes the implementation outcome of integrating this grid-tied PV system in grid connected areas, especially in the capital of Bangladesh.

Keywords

  • PV system without storage
  • Grid-tie inverter
  • Critical AC load
  • Transfer switch
  • Control scheme
  • Anti-Islanding
  • Net metering
266-T778

How to Cite

Copied

Md. Rejwanur Rashid Mojumdar, Arif Md. Waliullah Bhuiyan, Hamza Kadir, Md. Nizamul Haque Shakil, and Ahmed-Ur-Rahman, "Design & Analysis of an Optimized Grid-tied PV System: Perspective Bangladesh," International Journal of Engineering and Technology, vol. 3, no. 4, pp. 435-439, 2011. https://doi.org/ 10.7763/IJET.2011.V3.266

Copyright & License

Copyright © 2011 by the authors. This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited (CC BY 4.0).

Article Metrics in Dimensions

Copyright © 2009-2026. International Journal of Engineering and Technology. Unless otherwise stated. 
E-mail: ijet_Editor@126.com