• May 03, 2016 News! Vol.7, No.5 has been indexed by EI(Inspec)!   [Click]
  • May 03, 2016 News! Vol.7, No.4 has been indexed by EI(Inspec)!   [Click]
  • Feb 08, 2017 News!Welcome Dr. Lei Chen from China to join the Editorial board of IJET.   [Click]
General Information
Editor-in-chief
Prof. T. Hikmet Karakoc
Anadolu University, Faculty of Aeronautics and Astronautics, Turkey

IJET 2011 Vol.3(1): 22-25 ISSN: 1793-8236
DOI: 10.7763/IJET.2011.V3.194

Changing Requirements – Correlated to Risk or Quality?

S. Arumuga Perumal and Ms. G. Kavitha

Abstract—The requirements are the high-level description of the functions provided by the system. Most of the IT projects experiences the changing requirements. Although the analyst paid a full attention to collect the complete set of requirements, the requirements will still change after the analysis phase. There are many reasons for the requirements to change in the development process. The changing requirements should be considered as a chance to improve the quality of the product and mitigate the risk of project failure. This paper discusses the reasons for change and reasons that the changing requirements are good for the software project and the Change Control Management.

Index Terms—Requirements, Changing Requirements, Quality, Risk.

[PDF]

Cite: S. Arumuga Perumal and G. Kavitha, "Changing Requirements – Correlated to Risk or Quality?," International Journal of Engineering and Technology vol. 3, no. 1, pp. 22-25, 2011.

Copyright © 2008-2015. International Journal of Engineering and Technology. All rights reserved. 
E-mail: ijet@vip.163.com