• Mar 26, 2024 News!Vol.16, No. 1 has been published with online version.   [Click]
  • Jan 02, 2024 News!All papers in IJET will be publihsed article by article staring from 2024.
  • Nov 03, 2023 News!News | Vol.15, No. 4 has been published with online version.   [Click]
General Information
    • ISSN: 1793-8236 (Online)
    • Abbreviated Title Int. J. Eng. Technol.
    • Frequency:  Quarterly 
    • DOI: 10.7763/IJET
    • Managing Editor: Ms. Jennifer Zeng
    • Abstracting/ Indexing: Inspec (IET), CNKI Google Scholar, EBSCO, ProQuest, Crossref, etc.
    • E-mail: ijet_Editor@126.com
Editor-in-chief
IJET 2011 Vol.3(1): 22-25 ISSN: 1793-8236
DOI: 10.7763/IJET.2011.V3.194

Changing Requirements – Correlated to Risk or Quality?

S. Arumuga Perumal and Ms. G. Kavitha

Abstract—The requirements are the high-level description of the functions provided by the system. Most of the IT projects experiences the changing requirements. Although the analyst paid a full attention to collect the complete set of requirements, the requirements will still change after the analysis phase. There are many reasons for the requirements to change in the development process. The changing requirements should be considered as a chance to improve the quality of the product and mitigate the risk of project failure. This paper discusses the reasons for change and reasons that the changing requirements are good for the software project and the Change Control Management.

Index Terms—Requirements, Changing Requirements, Quality, Risk.

[PDF]

Cite: S. Arumuga Perumal and G. Kavitha, "Changing Requirements – Correlated to Risk or Quality?," International Journal of Engineering and Technology vol. 3, no. 1, pp. 22-25, 2011.

Copyright © 2008-2024. International Journal of Engineering and Technology. All rights reserved. 
E-mail: ijet_Editor@126.com