• Mar 26, 2024 News!Vol.16, No. 1 has been published with online version.   [Click]
  • Jan 02, 2024 News!All papers in IJET will be publihsed article by article staring from 2024.
  • Nov 03, 2023 News!News | Vol.15, No. 4 has been published with online version.   [Click]
General Information
    • ISSN: 1793-8236 (Online)
    • Abbreviated Title Int. J. Eng. Technol.
    • Frequency:  Quarterly 
    • DOI: 10.7763/IJET
    • Managing Editor: Ms. Jennifer Zeng
    • Abstracting/ Indexing: Inspec (IET), CNKI Google Scholar, EBSCO, ProQuest, Crossref, etc.
    • E-mail: ijet_Editor@126.com
Editor-in-chief
IJET 2015 Vol.7(6): 502-507 ISSN: 1793-8236
DOI: 10.7763/IJET.2015.V7.845

Project Scheduling Problem Constrained by Flexible Resource with Capability Difference

Xinhui Zhao, Xuezhi Lü, Qiyi Mei, and Weidong Feng

Abstract—Along with the resource in resource-constrained project scheduling problem being extended to flexible resource with capability difference, a mix-integer programming model is established for project scheduling problem constrained by flexible resource with capability difference (PSPFRCD). Formulated model is a practical extension of traditional resource-constrained project scheduling problem (RCPSP). To solve the model, it presented particle swarm optimization algorithms based on activity list. In decoding process of particle swarm optimization (PSO), a Dispatching rule based Flexible Resource Assignment Algorithm (DFRAA) is presented, and it discusses Modified Serial Schedule Generation Scheme (MSSGS) and Modified Parallel Schedule Generation Scheme (MPSGS), algorithm framework and selective particle update methods in detail. Comprehensive computational experiments were performed on adapted standard project sets in PSPLIB. Experimental results verify feasibility and effectiveness of algorithm, results also show that PSO algorithm which uses MSSGS and most suitable dispatching rule has high solution quality.

Index Terms—Flexible resource, capability difference, resource-constrained, project scheduling problem, particle swarm optimization.

Xinhui Zhao is now with Nanjing Artillery Acedemy, Nanjing, Jiangsu, 211100, China (e-mail: enihc@ tom.com).
Xuezhi. Lü, Qiyi Mei, and Weidong Feng are with the Artillery Training Base of General Staff, Xuanhua, Hebei, 075100, China (e-mail: ghostsheep@tom.com, meiqyi@hotmail.com, qdpingzi@tom.com).

[PDF]

Cite: Xinhui Zhao, Xuezhi Lü, Qiyi Mei, and Weidong Feng, "Project Scheduling Problem Constrained by Flexible Resource with Capability Difference," International Journal of Engineering and Technology vol. 7, no. 6, pp. 502-507, 2015.

Copyright © 2008-2024. International Journal of Engineering and Technology. All rights reserved. 
E-mail: ijet_Editor@126.com