• Mar 26, 2024 News!Vol.16, No. 1 has been published with online version.   [Click]
  • Jan 02, 2024 News!All papers in IJET will be publihsed article by article staring from 2024.
  • Nov 03, 2023 News!News | Vol.15, No. 4 has been published with online version.   [Click]
General Information
    • ISSN: 1793-8236 (Online)
    • Abbreviated Title Int. J. Eng. Technol.
    • Frequency:  Quarterly 
    • DOI: 10.7763/IJET
    • Managing Editor: Ms. Jennifer Zeng
    • Abstracting/ Indexing: Inspec (IET), CNKI Google Scholar, EBSCO, ProQuest, Crossref, etc.
    • E-mail: ijet_Editor@126.com
Editor-in-chief
IJET 2019 Vol.11(6): 341-347 ISSN: 1793-8236
DOI: 10.7763/IJET.2019.V11.1172

Bim Based Analysis of Time and Cost for Multi Storey Commercial Building

M. Gopal Naik

Abstract—With the advent of Building Information Modeling (BIM) software, the Designer/Architect is given the opportunity to design the building, and the software develops the appropriate plans and sections needed for construction. Among the new developed concepts and BIM applications, two of the concepts most frequently used with the support of BIM technology in the planning, organization and scheduling of projects are 4D and 5D in which a 3D model is tied to its time of execution (4D) and its corresponding cost (5D). Purpose of this study is to develop the BIM model for visualization of building information to meet the needs in conjunction with the specially tailored programs developed for designers and builders. World Trade Center that is coming up in Kochi, Kerala has been taken up as the case study. A 3D model has been created using Autodesk Revit with the 2D AutoCAD drawings. Subsequently, a prototype 4D Building Information Model was created and studied. Furthermore, the BIM-based schedule was integrated to the 4D model and also the corresponding cost estimation (5D) is also done. Results of this study prove that BIM can be used to improve jobsite productivity. This study gives a clear idea of benefits that can be obtained using BIM process saving Time and Cost of Construction and as how the construction Documentation becomes easier.

Index Terms—Planning and scheduling, time and cost, building information modeling.

M. Gopal Naik is with University College of Engineering (A), Osmania University, Hyderabad, Telangana State, India (e-mail: mgnaikc@gmail.com).

[PDF]

Cite: M. Gopal Naik, "Bim Based Analysis of Time and Cost for Multi Storey Commercial Building," International Journal of Engineering and Technology vol. 11, no. 6, pp. 341-347, 2019.